369-sitching
4/5 stagger-sitching
cross-sitching
1.The surface of floor must be completely dry.Please note that even though the floor may appear dry,it may still retain moisture.
2.Any paint,dirt,debris,etc.must be completely removed from the floor before installation.
3.Ensure that floor surface is flat and level.
4.Maintain room temperature above 15℃(59℉) before installation.Flooring products must be kept in the environment for at least 24 hours before installation begins.
At the time of engagement, clean the short female groove and insert the short male groove of the second plate into it at the angle of 45 degrees, then press gently to make it tight. Complete the first row in order.
The female groove should be cleaned up when pave the long side. Insert the long male groove into the female groove of the upper row at the angle of 45 degrees.
Insert the long male groove into the female groove of the upper row at the angle of 45 degrees. Insert the female groove of the second row into the male groove of the upper row and press it gently to make it completely close. And so on to the last.
When paving the last row, align the floor to be cut on the upper floor, and then affix the complete floor to the wall and cut along the edge of the female groove.
|